Air Handling Unit, Ahu, Fresh Air Machine

Air Handling Unit, Ahu, Fresh Air Machine

Package Size 5000.00cm * 1500.00cm * 2000.00cm Package Gross Weight 1000.000kg TICA will eatablish research centers and
Basic Info.
Model NO. TICA
Air Tube Material Galvanized Sheet
Corrosion Durability Ultrahigh
Operating Voltage 380/400 VAC
Noise Level Low
Application Fields Air Cooling and Cleaning
Mounting Floor Standing
Lifetime >20 years
Certification RoHS, ISO, CE, CCC, RoHS, CE, ISO9001
Condition New
Name Ahu
Filter G8, F9, H13
Keywords Air Handling Units
Feature Corrosion-Resistant, Heat-Resistant
Standard Nonstandard
Material Alloy
Transport Package Standard Wooden Box Packaging
Specification Fully bespoke product, no specific dimensions.
Trademark OEM
Origin China
HS Code 8415830000
Production Capacity 50000/Year
Packaging & Delivery
Package Size 5000.00cm * 1500.00cm * 2000.00cm Package Gross Weight 1000.000kg
Product Description

Air Handling Unit, Ahu, Fresh Air Machine

Air Handling Unit, Ahu, Fresh Air Machine

TICA will eatablish research centers and production bases in the USA and Europe.

Air Handling Unit, Ahu, Fresh Air Machine

Air Handling Unit, Ahu, Fresh Air Machine

Air Handling Unit, Ahu, Fresh Air Machine


Falling Film Evaporation Technology of Screw Chiller
· CFD simulation design enables to spray refrigerant evenly on heat exchange tube to form a fluid film,hence to improve the heat transfer performance while reducing theconsumption of refrigerant.
· 10% increase in product performance,30% reduction in refrigerant consumption.
· Winner of China's energy-saving product certification.
Advanced Data Center for AfterSales Services
The service centre takes the customers to the era of Cloud computing that provides real time data monitoring,defects analysis with suggested solutions,customized maintenance, as well as remote hosting services, to ensure normal operationof its centrifugal chillers,screw chillers,VRF units and ORC lowtemperature powergeneration system.

Delivery

TIME OF DELIVERY:Within 35 days after receiving deposit .

Payment

Support T/T , L/C

After-sale

During the warranty period, machines which cannot run due to quality problems,Choose the following options.

1) During the one-year warranty period, non-human factors cause product quality problems, and provide parts replacement and repair and maintenance services.

2) In addition to the one-year warranty period, parts replacement and repair and maintenance services are provided at the user's expense.

Promotion Method

1) Pay the full amount in one lump sum, 1% discount.
2) Recommend other customers to buy and return a part of the commission.